NDA is compulsory before we continue after enquiry
Pictures and more information available after signing the NDA
R54 000 000.00 negotiable
Erf Size: 14460m²
Major re-development was done in 2022. The store was converted to a brand New OK express and the forecourt, pumps and tanks were redone.
GROSS INCOME: +R3,667M/ month
Business and property
Shop tumover: R2m per month
Pumping ±323k litres per month
Includes Galito's and OK Express
Average fuel pumped: ±323k litres/month
Solar and battery system installed Additional land available (retail and/or truck stop)
On a fuel basis, there is still outside with the expansion of a truck stop in the empty stand on the corner which is part of the site